Advice
Heatwave preparation checklist for UK buildings
Prepare your building for a heatwave: inspect shading and ventilation, check cooling equipment, assign responsibilities and plan for rooms that overheat.
Prepare the building before rooms become hot
Prepare a building for a heatwave by reducing incoming heat, checking ventilation and cooling equipment, identifying the rooms and people needing priority, and assigning someone to act on the forecast. Start before temperatures rise: once walls, floors and furnishings have absorbed heat, cooling the air does not immediately remove that stored warmth.
Use a heatwave preparation checklist to make decisions in advance, not simply to record that windows and blinds exist. Establish which windows can safely open, who will operate shading, where temporary cooling could go and what happens if the preferred room becomes unusable.
For a home, this may mean preparing one shaded living room and changing when household appliances run. For a workplace or managed building, it also means coordinating occupants, cleaners, maintenance staff and security so their actions support the same plan. Agree who can authorise changes rather than waiting for complaints.
Survey the rooms that are most likely to overheat
Inspect the building room by room and rank spaces by likely heat exposure and consequences of overheating. Start with rooms beneath the roof, spaces with substantial sun-facing glazing, crowded areas and rooms containing heat-producing equipment. Do not assume the largest room is the biggest problem.
Record each priority room’s dimensions, ceiling height, usual occupancy, hours of use, window arrangement and equipment load. Note whether doors need to stay open, whether there is shading outside the glass and whether existing cooling serves that room independently. These details help an engineer or hire supplier assess the task.
Use indoor thermometers to establish a baseline, with sensors away from direct sunlight, equipment exhausts and cooling outlets. Check readings at consistent times, including late afternoon and evening where relevant. A central corridor reading may conceal a hot meeting room or bedroom; record conditions where people actually spend time.
Control sunlight and decide when windows should open
Reduce solar heat before it enters, and use outdoor air for cooling only when conditions make that helpful. Check that blinds, curtains, shutters and any existing external shading operate properly. Close shading before direct sunlight reaches the glass rather than after occupants notice the room heating up.
External shading intercepts sunlight before it reaches the glazing, but temporary installations need suitable fixings and consideration of wind and access. Do not improvise awnings or attach reflective products to glass without checking suitability with the manufacturer or a competent installer. Keep escape routes and window controls accessible.
Opening windows is not automatically a cooling measure. Compare indoor and outdoor conditions: ventilation can remove heat when outside air is cooler, but may admit heat during the hottest period. Do not disable background or mechanical ventilation needed for indoor air quality. Plan evening or early-morning airing only where security, weather, noise and safe access allow it.
Check equipment and remove avoidable heat sources
Test existing cooling and ventilation before they are needed continuously. Run equipment through its normal controls, check for fault messages and unusual noise, and confirm that supply and extract grilles are unobstructed. Report problems early enough to discuss repair options rather than discovering them during peak heat.
Clean accessible filters only as instructed by the manufacturer, and arrange competent servicing where required. Check condensate arrangements for visible leaks, damage or blockages that can be inspected safely. Keep outdoor heat-rejection equipment clear of stored materials. Electrical, refrigerant and internal mechanical work belongs with qualified technicians.
Reduce heat generated inside the building without disrupting essential services. Switch off genuinely unused lighting and equipment, and consider moving cooking, laundry or other heat-producing tasks to cooler periods. Do not unplug shared IT, refrigeration or safety systems casually. Ask the responsible person which loads can be reduced and which must remain running.
Make temporary cooling physically possible
Prepare an exhaust route, electrical supply and suitable position before booking a portable air conditioner. It must discharge heat outside through an arrangement permitted by its manufacturer. Venting into a corridor, ceiling void or neighbouring room simply transfers the problem within the building.
Measure the proposed window or opening and check how it can be sealed around the exhaust outlet. Keep the hose within the manufacturer’s permitted length and routing, with the specified clearances around the unit. Confirm how condensate is handled: some operating conditions or models require emptying or a drain connection.
ChillDash hires professional-grade portable units rated at 12,000–14,000 BTU, delivered and collected nationwide. That rating alone does not establish suitability for a particular room. Give the supplier the room measurements, glazing, occupancy, equipment loads and access details. A heavily glazed room and a shaded room of equal floor area present different cooling demands.
Identify a suitable wall socket and follow the unit’s electrical instructions; avoid improvised extensions or multiway adaptors. Where several units or other substantial loads are proposed, ask a competent electrician to assess the supply. Check noise requirements and keep hoses and cables away from circulation and escape routes.
Run a readiness check when hot weather is forecast
Turn the plan into a physical walk-through, with a named person checking each item. The test is whether the building can actually operate as intended, including when the usual manager, caretaker or householder is absent.
First, confirm access and operation. Locate window keys, test shading controls, clear ventilation grilles and check that furniture has not blocked the planned cooling position. Measure doorways and note stairs, lifts and access restrictions before arranging equipment delivery.
Next, confirm responsibilities and supplies. Agree who closes blinds, monitors temperatures, handles condensate and secures windows. Keep manufacturer instructions and the building’s established maintenance contacts accessible. If hiring equipment, check availability and explain delivery and collection arrangements; the price is confirmed when availability is checked.
Finally, rehearse the fallback. Identify an alternative room or working arrangement, decide who can authorise relocation and tell occupants how changes will be communicated. Make clear which windows may remain open unattended and which must be secured. Resolve conflicting instructions before the hot spell begins.
Monitor occupied rooms and adjust the plan
Review actual conditions throughout the hot spell rather than assuming the initial setup will remain adequate. Check priority rooms when occupied and near their expected hottest period. Record the temperature alongside occupancy, shading position and whether cooling is running, so changes have an explanation.
If a room keeps warming, inspect the basics first: direct sun, open doors, a displaced exhaust seal, blocked airflow or additional equipment. Do not respond only by lowering the thermostat. That will not overcome an unsuitable installation or a cooling load beyond the equipment’s capacity.
Listen to occupants as well as reading thermometers, particularly where people cannot easily move or adjust their surroundings. Agree building-specific triggers for intervention with the responsible manager and seek qualified advice where welfare or specialist environments are involved. If someone becomes unwell, follow appropriate first-aid and medical guidance rather than waiting for the room to cool.
Recognise when the plan cannot keep the space usable
Treat cooling as a limited resource: some rooms will need reduced occupancy, changed hours or temporary closure rather than more adjustments to controls. Large glazed spaces, open-plan areas and buildings without a practical exhaust route may not be suitable for the portable cooling arrangement initially proposed.
Fans can improve comfort through air movement, but they do not remove heat from the room. Likewise, a portable air conditioner does not necessarily provide fresh air. Maintain the building’s ventilation strategy, and ask a competent engineer to resolve conflicts between cooling, ventilation and the intended use of the space.
Never prop open fire doors, obstruct exits, defeat window restrictors or overload sockets to make a heat plan work. If nights remain warm or windows cannot safely open, overnight airing may offer little help. After the hot spell, use the monitoring record to identify longer-term shading, ventilation or building-fabric improvements for professional assessment.
Common questions
Can an empty building be left unprepared during a heatwave?
No. Check temperature-sensitive contents, refrigeration and essential equipment even when nobody is present. Use their specified storage or operating conditions to decide what needs monitoring. Arrange authorised access if an alarm or equipment fault requires attendance.
Should tenants buy or hire cooling before speaking to the landlord?
Check the tenancy terms and discuss any installation affecting windows, walls, drainage or shared areas first. Send measurements and a proposed layout so permission and practical concerns can be addressed together. A freestanding unit still needs a suitable exhaust arrangement.
Is a consumer thermometer enough for monitoring?
It can help track room-temperature trends, but it cannot establish every aspect of comfort or safety. If two devices disagree, compare them side by side before drawing conclusions. Specialist premises may need specified monitoring equipment and professional interpretation.
What should reception or security staff know about hired equipment?
Give them the agreed access arrangements, intended room, responsible contact and any handling restrictions. Confirm who will receive the equipment and keep packaging or accessories secure for collection. Do not assume delivery staff can resolve unreported stairs or restricted access.
What should be kept in the building’s heatwave record?
Keep room readings, equipment faults, occupant feedback and the changes that helped or failed. Include installation photographs where appropriate, without capturing private information. This gives future staff a practical starting point and helps target maintenance or improvement work.